Seaward PrimeTest 50 Instrukcje Operacyjne

Przeglądaj online lub pobierz Instrukcje Operacyjne dla Ładowarki do akumulatorów Seaward PrimeTest 50. Seaward PrimeTest 50 Operating instructions Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 2 - Operating Instructions

PrimeTest 350 Operating Instructions - 9 - Disposal of old product This product has been designed and manufactured with high quality materials

Strona 3

PrimeTest 350 Operating Instructions - 99 - 15.4 Protective Earth Conductor Current Measurement Method Differential Test Voltage Mains su

Strona 4

PrimeTest 350 Operating Instructions - 100 - 15.7 Load Measurement Load current is measured during the 2 powered tests only. The load in kVA is cal

Strona 5

PrimeTest 350 Operating Instructions - 101 - 16 Environmental Conditions 16.1 The PrimeTest 350 has been designed to perform tests and measureme

Strona 6

PrimeTest 350 Operating Instructions - 102 - 17 Maintenance Warning: Always ensure that the PrimeTest 350 is disconnected from all voltage sources

Strona 7

PrimeTest 350 Operating Instructions - 103 - 17.3 Cleaning Clean the external case of the PrimeTest 350 with a clean dry cloth. Avoid using solven

Strona 8

PrimeTest 350 Operating Instructions - 104 - 17.5 Battery Replacement Over a period of time, (typically 1 to 2 years), the batteries will loose the

Strona 9

PrimeTest 350 Operating Instructions - 105 - 17.6 Replacing All Fuses. If, during one of the powered tests, a message appears stating that incomin

Strona 10 - Disposal of old product

PrimeTest 350 Operating Instructions - 106 - Lift the defective fuse completely out of the fuse holder. Insert a new fuse as described and specifie

Strona 11

PrimeTest 350 Operating Instructions - 107 - 17.7 Service and Calibration. To maintain the specified accuracy of the measurement results, the ins

Strona 12

PrimeTest 350 Operating Instructions - 108 - Spare Parts. Seaward Part No Fuse 250V 16A 5x20mm

Strona 13

PrimeTest 350 Operating Instructions - 10 - Table of Contents 1 User Notes ...15 2 Safety Note

Strona 14 - PrimeTest 350

PrimeTest 350 Operating Instructions - 109 - 18 Useful Information Parameter Default Min Max Earth Continuity P/F limit 0.10 0.01 5.0 Earth Con

Strona 15

PrimeTest 350 Operating Instructions - 110 -

Strona 17

PrimeTest 350 Operating Instructions - 11 - 10.1.5 Sub Lkg Factor ...44 10.1.6 Earth Result ...

Strona 18

PrimeTest 350 Operating Instructions - 12 - 14.1.1 Test n Tag Elite...92 14.1.2 Citizen CMP-10BT ...

Strona 19

PrimeTest 350 Operating Instructions - 13 - DECLARATION OF CONFORMITY As the manufacturer of the apparatus listed, declare under our sole re

Strona 20

PrimeTest 350 Operating Instructions - 14 - Introduction The PrimeTest 350 is a hand held, battery powered, multifunction test instrument capable o

Strona 21

PrimeTest 350 Operating Instructions - 15 - 1 User Notes These operating instructions are intended for the use of adequately trained personnel.

Strona 22

PrimeTest 350 Operating Instructions - 16 - 2 Safety Notes This PrimeTest 350 has been built and tested in accordance with: BS EN 61010-1: 2001. B

Strona 23

PrimeTest 350 Operating Instructions - 17 - - Do not operate the PrimeTest 350 in an explosive gas or dust environment. - Do not touch the bare t

Strona 24

PrimeTest 350 Operating Instructions - 18 - 3 Accessories 3.1 Standard Accessories The PrimeTest 350 is supplied with the following items: 3.1.1

Strona 25

Operating Instructions Bracken Hill South West Industrial Estate Peterlee Co Durham SR8 2SW ENGLAND Tel: +44(0

Strona 26

PrimeTest 350 Operating Instructions - 19 - 4 Unit Description Refer to fig. 1 and fig. 2. The PrimeTest 350 is a hand held, multi function, instr

Strona 27

PrimeTest 350 Operating Instructions - 20 - 5 Getting Started 5.1 Charging New Batteries Before using the PrimeTest 350 for the first time the re

Strona 28

PrimeTest 350 Operating Instructions - 21 - 5.4 Battery Health Check While the PrimeTest 350 is powered on there are periodic checks of the batter

Strona 29

PrimeTest 350 Operating Instructions - 22 - 6 Data Transfer Data transfer is used to transfer records and configuration data to and from a PC. It

Strona 30

PrimeTest 350 Operating Instructions - 23 - Note: If there is no Favourite Computer configured then only the RS-232 option will be available as sh

Strona 31

PrimeTest 350 Operating Instructions - 24 - Ensure that the PC application is ready to receive data then press Send (F4). A progress bar, as

Strona 32

PrimeTest 350 Operating Instructions - 25 - 6.2 Upload from PC Select the Upload from PC option from the Data Transfer menu. The PrimeTest 350 wil

Strona 33

PrimeTest 350 Operating Instructions - 26 - The Send (F4) key will transfer the Site, Location, User and Comments list from the PrimeTest 350 to th

Strona 34

PrimeTest 350 Operating Instructions - 27 - When the data has all been transferred, click on Capture -> Stop Capture. You now have the configura

Strona 35

PrimeTest 350 Operating Instructions - 28 - 6.4 Load Test’n’Tag Logo A bitmap logo can be transferred to the PrimeTest 350 for use with the Seawar

Strona 36

PrimeTest 350 Operating Instructions - 2 -

Strona 37

PrimeTest 350 Operating Instructions - 29 - 7 View Saved Data This function allows saved data to be reviewed and transferred to PC or Pass/Fail L

Strona 38

PrimeTest 350 Operating Instructions - 30 - download or delete assets. 7.2 Options The Options (F3) key allows operations to be performed on r

Strona 39

PrimeTest 350 Operating Instructions - 31 - 8 Memory Options Memory options is used to view information about the PrimeTest 350 memory status. Pres

Strona 40

PrimeTest 350 Operating Instructions - 32 - 9 Configuration The configuration facility is used to edit test sequences, set time and date and confi

Strona 41

PrimeTest 350 Operating Instructions - 33 - Note: The PrimeTest 350 can store a total of 50 sequences, some of these are the pre-configured ‘default

Strona 42

PrimeTest 350 Operating Instructions - 34 - 9.1.3 Delete Sequence Sequences can be deleted if no longer required to make space for new sequences. A

Strona 43

PrimeTest 350 Operating Instructions - 35 - arrow key to show the list of available test. Now scroll through the list of default tests until the r

Strona 44

PrimeTest 350 Operating Instructions - 36 - In the example Insulation Test above, the required duration in seconds, pass/fail threshold in MΩ and nu

Strona 45

PrimeTest 350 Operating Instructions - 37 - User tests are fully compatible with Seaward PATGuard software. To insert a User Test in a new sequen

Strona 46

PrimeTest 350 Operating Instructions - 38 - An example test sequence created to measure microwave leakage is shown below. When this test sequenc

Strona 47

PrimeTest 350 Operating Instructions - 3 - Figure 1 PrimeTest 350 Front View Figure 2 PrimeTest 350 End View

Strona 48

PrimeTest 350 Operating Instructions - 39 - The user is now required to enter a measurement and select a Pass or Fail for this measurement. The mea

Strona 49

PrimeTest 350 Operating Instructions - 40 - 9.2 Set Date/Time The Primetest 350 is equipped with a real-time clock. To alter the time or date pre

Strona 50

PrimeTest 350 Operating Instructions - 41 - 9.7 Verify Calibration After 12 months have elapsed since the last verification or calibration, the Pri

Strona 51

PrimeTest 350 Operating Instructions - 42 - 10 User Options Each User has the option to customise aspects of the PrimeTest 350 in accordance with t

Strona 52

PrimeTest 350 Operating Instructions - 43 - 10.1.1 Asset ID This can be set to automatically increment the ID number at the end of each test, pres

Strona 53

PrimeTest 350 Operating Instructions - 44 - New Test will auto save at the end of a test sequence and then open the Asset Details window ready fo

Strona 54

PrimeTest 350 Operating Instructions - 45 - 10.1.6 Earth Result - can be set to “Worst” or “Last”. If set to “Worst” then the result of an Earth c

Strona 55

PrimeTest 350 Operating Instructions - 46 - 10.2 Preferences There are a number of general features within the PrimeTest 350 that can be setup/cus

Strona 56

PrimeTest 350 Operating Instructions - 47 - “Barcode comments” option allows general text fields to be scanned as user comments at the end of the te

Strona 57

PrimeTest 350 Operating Instructions - 48 - The Change User option is used to change the active User. From the User Options menu, select Change Use

Strona 58

PrimeTest 350 Operating Instructions - 4 - Figure 3 Earth Continuity Measurement

Strona 59

PrimeTest 350 Operating Instructions - 49 - Press OK (F4) to accept the new user name. This new user will have no password set as default. If a

Strona 60

PrimeTest 350 Operating Instructions - 50 - This feature allows an administrator to configure the instrument and then prevent other users from maki

Strona 61

PrimeTest 350 Operating Instructions - 51 - new password again. Press Enter (F4) followed by OK (F4) to finish. Note: If there are any mistakes in

Strona 62

PrimeTest 350 Operating Instructions - 52 - 11 Manual Test Functions Once in Manual mode the tester can perform one of seven tests as described bel

Strona 63

PrimeTest 350 Operating Instructions - 53 - Fit the Appliance mains plug into the EUT outlet. Connect the Earth Bond lead to the appliance metal par

Strona 64

PrimeTest 350 Operating Instructions - 54 - Press Class (F2) to set the class of the appliance under test. For a class II appliance the probe symb

Strona 65

PrimeTest 350 Operating Instructions - 55 - During this test, a nominal voltage of 40V a.c. rms is applied between the earth pin and both the live a

Strona 66

PrimeTest 350 Operating Instructions - 56 - Attention: Avoid prolonged, repeated use at full load (16A) and excessive test duration as this may red

Strona 67

PrimeTest 350 Operating Instructions - 57 - appliance to earth via the ‘body model’. The Tester displays the result in milliamps (mA). In the top le

Strona 68

PrimeTest 350 Operating Instructions - 58 - 11.6 Earth Loop Resistance Refer to Fig 7 This test is applicable to the mains electrical installatio

Strona 69

PrimeTest 350 Operating Instructions - 5 - Figure 5 Substitute Leakage Measurement (Class II) Figure 6 Pro

Strona 70

PrimeTest 350 Operating Instructions - 59 - Fit the power lead supplied to the PrimeTest 350 and plug the other end into the mains outlet under test

Strona 71

PrimeTest 350 Operating Instructions - 60 - To start the IEC lead test, press the green START button. The earth continuity resistance for the lead

Strona 72

PrimeTest 350 Operating Instructions - 61 - 12 Bluetooth Functions The PrimeTest 350 has built in Bluetooth connectivity. It is possible to connect

Strona 73

PrimeTest 350 Operating Instructions - 62 - Note: The adapter must not be plugged into the USB port until specifically requested to do so by the in

Strona 74

PrimeTest 350 Operating Instructions - 63 - Use the up/down arrow keys to highlight the device type (in this case Computer) then press Setup (F3).

Strona 75

PrimeTest 350 Operating Instructions - 64 - In the example above, the search has identified Bluetooth devices named “GX30” and “My Laptop.” Note:

Strona 76

PrimeTest 350 Operating Instructions - 65 - To add further devices to the list of available computers select the New again, use the arrow keys to s

Strona 77

PrimeTest 350 Operating Instructions - 66 - “My Laptop” is now a Bluetooth Favourite and the PrimeTest 350 will automatically establish a connectio

Strona 78

PrimeTest 350 Operating Instructions - 67 - 12.3 Bluetooth Connection to a Printer The following shows how to add a Printer to Bluetooth Favouri

Strona 79

PrimeTest 350 Operating Instructions - 68 - If your printer is not already in the “New” list then you need to search for it now by pressing press S

Strona 80

PrimeTest 350 Operating Instructions - 6 - Figure 7 Touch Leakage Measurement Figure 8 RCD and Earth Loop

Strona 81

PrimeTest 350 Operating Instructions - 69 - 12.4 Bluetooth Connection to a PC When the PrimeTest 350 is required to download data to, or upload d

Strona 82

PrimeTest 350 Operating Instructions - 70 - 13 Automatic Test Mode The automatic mode allows the PrimeTest 350 to perform a predefined test sequen

Strona 83

PrimeTest 350 Operating Instructions - 71 - Whilst searching, the Bluetooth status icon shows an egg timer in the top right hand corner of the disp

Strona 84

PrimeTest 350 Operating Instructions - 72 - keypad. Simply enter the required ID in the Asset ID field as shown below. The function keys can be used

Strona 85

PrimeTest 350 Operating Instructions - 73 - Location and Comments data. When a character is entered using the keypad, the PrimeTest 350 will automa

Strona 86

PrimeTest 350 Operating Instructions - 74 - The UP/DOWN can now be used to scroll through the Site list until the required Site is highlighted.

Strona 87

PrimeTest 350 Operating Instructions - 75 - Note: To see a list of all Sites currently stored in the PrimeTest 350 memory, simply press the left of

Strona 88

PrimeTest 350 Operating Instructions - 76 - 13.1.2 Adding a new Site If the required Site is not already in memory, simply use the keypad to enter

Strona 89

PrimeTest 350 Operating Instructions - 77 - 13.3 Entering Location Information Move the cursor to the Location field. A Location can be selected i

Strona 90

PrimeTest 350 Operating Instructions - 78 - Select the desired Location from the list using the UP/DOWN arrows and press Select (F4) to confirm. N

Strona 91

PrimeTest 350 Operating Instructions - 7 - Figure 9 IEC Lead Test

Strona 92

PrimeTest 350 Operating Instructions - 79 - The Edit keys can be used to correct the entry. When the required data has been entered, press the Ent

Strona 93

PrimeTest 350 Operating Instructions - 80 - Pressing the Left or Right arrows will open the list of available test sequences Press the index lett

Strona 94

PrimeTest 350 Operating Instructions - 81 - To enter a value, simply move the cursor to the correct field using the UP/DOWN arrows Now enter the r

Strona 95

PrimeTest 350 Operating Instructions - 82 - If the red STOP key is pressed during a test then the test is aborted and the abort menu appears as sho

Strona 96

PrimeTest 350 Operating Instructions - 83 - The sequence will now progress to the Earth Continuity test as shown. This test will measure the resis

Strona 97

PrimeTest 350 Operating Instructions - 84 - The test will run until the countdown timer in the Duration field has reached zero. Note: During the

Strona 98

PrimeTest 350 Operating Instructions - 85 - If the Earth Continuity test results in a Fail and the On Test Failure is set to End Test the sequence

Strona 99

PrimeTest 350 Operating Instructions - 86 - Note: In order to perform an Insulation Resistance measurement correctly, the EUT mains switch must b

Strona 100

PrimeTest 350 Operating Instructions - 87 - The Class I icon is illuminated to indicate that the insulation resistance is measured between the live

Strona 101 - - 100

PrimeTest 350 Operating Instructions - 88 - The sequence will now progress to the Protective Conductor Current measurement. The display now shows

Strona 102 - - 101

PrimeTest 350 Operating Instructions - 8 - Limited Warranty & Limitation of Liability SEAWARD Electronic Limited guarantees this product to b

Strona 103 - - 102

PrimeTest 350 Operating Instructions - 89 - The Test Type field indicates whether the sequence was a visual inspection only or measured values wer

Strona 104 - - 103

PrimeTest 350 Operating Instructions - 90 - 13.7.1 View Results This will display the results for each test in the sequence as shown below. The U

Strona 105 - - 104

PrimeTest 350 Operating Instructions - 91 - 13.7.3 Print Label This allows Pass/Fail labels to be printed using the printer in the Bluetooth Favour

Strona 106 - - 105

PrimeTest 350 Operating Instructions - 92 - 14 Printer Driver Specifications 14.1.1 Test n Tag Elite Note: The maximum number of characters tha

Strona 107 - - 106

PrimeTest 350 Operating Instructions - 93 - Note: In order to avoid damage to the print head, only genuine Seaward Test ‘n’ Tag Elite labels should

Strona 108 - - 107

PrimeTest 350 Operating Instructions - 94 - 14.1.2 Citizen CMP-10BT Note: The maximum number of characters that can be displayed on a CMP-10 barc

Strona 109 - - 108

PrimeTest 350 Operating Instructions - 95 - 14.1.3 Test n Tag This allows Test ‘n’ Tag labels to be produced using the Seaward Test ‘n’ Tag ther

Strona 110 - - 109

PrimeTest 350 Operating Instructions - 96 - The text in the banner line can be edited to show up to 29 chosen characters. The default Pre Feed an

Strona 111

PrimeTest 350 Operating Instructions - 97 - 14.1.4 Generic ASCII This printer driver uses only standard ASCII characters and so can be used with a

Strona 112

PrimeTest 350 Operating Instructions - 98 - 15 Electrical Specifications 15.1 Earth Continuity Test Current (2 load) ±200 mA Test Circuit Volta

Komentarze do niniejszej Instrukcji

Brak uwag